• salesteam@acecentro.com
  • +971 2 6737 900
Company Profile
ACE CENTRO ENTERPRISES
  • Home
  • About
  • Product Range
    • Our Partners
      • Assembly
      • Atlantic
      • Blastcrete
      • ChemGrout
      • Dragflow
      • Graco
      • Häny
      • Makinex
      • Matec
      • Neptune
      • Remu
      • Vector / Vac-con
    • Applications
      • Dredging
      • Fireproofing
      • Foam Concrete
      • Grouting
      • Guniting
      • Lifting and Loading
      • Plastering
      • Power Solutions
      • Robotic Spraying
      • Screeding
      • Shotcreting
      • Sludge Suction
      • Submersible Pumps
      • Surface Cleaning Solution
      • Surface Preparation
      • Vaccum System
    • Pre-Owned
    • Accessories
  • Rental Solutions
  • Service
    • Machine Servicing
    • Training
    • Case Study
  • Gallery
  • Contact
ACE CENTRO ENTERPRISES
  • Home
  • About
  • Product Range
    • Our Partners
      • Assembly
      • Atlantic
      • Blastcrete
      • ChemGrout
      • Dragflow
      • Graco
      • Häny
      • Matec
      • Neptune
      • Subsea Tech
      • Vector / Vac-con
    • Applications
      • Dredging
      • Fireproofing
      • Foam Concrete
      • Grouting
      • Guniting
      • Lifting and Loading
      • Plastering
      • Power Solutions
      • Robotic Spraying
      • Screeding
      • Shotcreting
      • Sludge Suction
      • Submersible Pumps
      • Surface Cleaning Solution
      • Surface Preparation
      • Vaccum System
    • Pre-Owned
    • Accessories
  • Rental Solutions
  • Service
    • Machine Servicing
    • Training
    • Case Study
  • Gallery
  • Contact

Location : Dubai - U.A.E.
Year : April 2018

Problem : After completion of secant pile wall and excavation of soil, the contractor had to complete the waterproofing work by spraying wet shotcrete on the secant pile walls. However, the piles of the mast structure around the site prevented the use of a scaffolding that could have been used for manual shotcrete work.

Solution : Based on site visits conducted by ACE service personnel, they provided a diesel engine / electric motor driven Robotic Shotcrete Spraying system to work in tandem with a diesel engine driven shotcrete pump that was placed above the excavation area. The robotic spraying system could move around the piles easily with the help of its rubber crawlers. The telescopic boom with its maximum vertical spraying height of 8.79 m could spray up to the top of the 7 m high secant piles with ease.

The finishing works were carried out by the client using man lifts. The client was able to complete their shotcrete work on time due to the heavy duty nature and unparalleled capabilities of the shotcrete spraying system.

Gallery

ACE CENTRO ENTERPRISES
ACE Building, M 03 & M 04
25th Street,
Sultan Bin Zayed the First (Muroor Road)
P. O. Box 95325
Abu Dhabi - United Arab Emirates.

salesteam@acecentro.com

+971 2 6737900

+971 2 6731100

+971 2 6737800

Follow Us

© 1998 - 2025 ACE . All rights reserved | Design and Developed by ACE